Page 22 - Studia Universitatis Hereditati, vol 9(2) (2021)
P. 22
ure 15. Dobra voda, the area between sections 1 and 2 larly rectangular or square, and the middle part
(photo M. Imamović). is filled with round, irregular stones of much
smaller size.
On the flattened part of the road near Dobra
voda, we found a channel 2.50 m long built un-
der the slope angle of 5% (14:9 degrees), with the
role of improving the flow of water. The width
of the road on the spot where the channel is lo-
cated is 3 m. On the same road section, we found
the smaller broken stones on the part without
stone plates, which were probably installed as a
base for the tread layer of the road construction.
On the cleaned-up parts of the road, especial-
ly on elevations, it is clear that there is a gentle
studia universitatis her editati, letnik 9 (2021), številk a 2 / volume 9 (2021), number 2 22
hereditati
Figure 16. Dobra voda, section 2 (photo M. Imamović). slope in road construction on both sides, which
was planned to diffuse water from the tread lay-
ably transported to locality Dobra voda from er of the route. From Dobra voda, the road went,
the quarry around 1 km away. Each plate is care- over the Vojnik locality, to the Drinjača valley,
fully formed - by using polishing technique and approximately on the spot of today’s market-
then installed.11 Curb stones are mostly irregu- place in Kladanj. According to the accounts of
older locals, there was a natural river pass there,
11 Finely polished cobbled road was found in Podrinje the so-called “gaz”.
(Truhelka 1981, 244-245).
(photo M. Imamović). is filled with round, irregular stones of much
smaller size.
On the flattened part of the road near Dobra
voda, we found a channel 2.50 m long built un-
der the slope angle of 5% (14:9 degrees), with the
role of improving the flow of water. The width
of the road on the spot where the channel is lo-
cated is 3 m. On the same road section, we found
the smaller broken stones on the part without
stone plates, which were probably installed as a
base for the tread layer of the road construction.
On the cleaned-up parts of the road, especial-
ly on elevations, it is clear that there is a gentle
studia universitatis her editati, letnik 9 (2021), številk a 2 / volume 9 (2021), number 2 22
hereditati
Figure 16. Dobra voda, section 2 (photo M. Imamović). slope in road construction on both sides, which
was planned to diffuse water from the tread lay-
ably transported to locality Dobra voda from er of the route. From Dobra voda, the road went,
the quarry around 1 km away. Each plate is care- over the Vojnik locality, to the Drinjača valley,
fully formed - by using polishing technique and approximately on the spot of today’s market-
then installed.11 Curb stones are mostly irregu- place in Kladanj. According to the accounts of
older locals, there was a natural river pass there,
11 Finely polished cobbled road was found in Podrinje the so-called “gaz”.
(Truhelka 1981, 244-245).